Can you install a pool table yourself?
You can assemble some flat-pack tables at home. Check that the manual allows it and that the people helping you can handle the parts on the route into the room. Book a billiard mechanic for a slate table, especially when the manual calls for experienced installers or the warranty requires authorized service. The steps below explain a typical three-piece slate job and the checks to make with the installer. Agree who does each part before assembly. If you want to assemble the base yourself, ask whether the installer will take the job. Leave the frame uncovered so they can inspect it before adding slate.
| Table | Installation plan |
|---|---|
| Flat-pack or folding non-slate | Home assembly if the manual allows it and the crew can handle the parts. Follow its leg, support or lock steps, then check floor contact and the bed. |
| Three-piece slate | A billiard mechanic familiar with the model. Confirm authorized service if required. Set the frame, support the panels, level the bed and finish both joints before cloth. |
| One-piece slate or specialty base | A crew that confirms the weight, access and maker’s assembly order. The bed needs steady support and leveling, but a one-piece bed has no joints to fill. |

Check your warranty before you separate delivery and installation into two bookings. The Brunswick lifetime table terms specify the maker or an authorized Brunswick dealer. The Olhausen lifetime terms specify the maker or an authorized dealer or agent. Both warranties normally apply to the original purchaser. If you’re buying used, ask the seller what paperwork comes with the table and confirm any coverage with the maker. For an outdoor table, use the model’s own installation and site instructions. Brunswick’s outdoor terms recommend a protected location and state separate coverage.
What should you measure before delivery?
Mark the final table position and check the tightest shot before you measure the delivery route. Ask the seller for both the actual playing area and the size of the whole cabinet. Enter your room dimensions and cue length in the Room Size Calculator to work out where to start. Try your actual stroke beside the nearest post, door or cabinet.
- Walk the delivery route. Ask for the length, width, thickness and weight of the largest pieces, including any packing that stays on during the carry. Measure clear door openings, the width and depth of each landing, the width between stair rails and any low overhead spot. If there’s an elevator, record its door and car dimensions. Send photos and measurements to the crew. Have them confirm the route before booking.

Measure the gap between the open door and the opposite stop. At a turn, record the width and depth of the landing. Send the installer the actual dimensions as carried, including packing. 
Measure up from the front edge of the tread to the low beam or ceiling and note the location. The crew checks how the packed piece clears it as they turn. - Settle the floor and lighting. Finish flooring or decide where the rug goes before the heavy parts arrive. If you’re unsure that the floor can carry the assembled table, have a structural engineer assess the floor and the load at the feet. Mark where the center of the table will sit under the light. The California House resource guide explains why the route and light should be resolved in advance.
- Confirm the delivery handoff. Ask whether freight stops at the curb, goes to an installer, or comes into the game room. Arrange any carry-in separately if it is outside the delivery scope.
A cabinet can fit the room even when the cue hits the open door. Set the door where it normally sits and try a shot at cue height before choosing the final position. If you need to rearrange a sofa or cabinet, use the Game Room Planner to compare layouts. Then test the cue again on both sides in the actual room.

What tools and parts should be ready?
Pull the parts and tools list from the exact model manual before opening the hardware bags. The manual for a home-assembly table tells you which socket size or driver bit you need. Set up a padded area where you can lay down finished wood and rails without scratching them. A manufacturer’s model library can help when a secondhand seller has lost the printed instructions. Match the model number before borrowing a diagram from a similar-looking table.
Ask a slate installer whether they bring the leveling equipment, the model’s wedges or adjusters, seam material and the correct cloth fasteners. A precision level shows whether the surface tilts. Lay a straightedge across a joint to see whether one panel sits higher than the other. The Centennial installation manual shows the supports and leveling hardware on that model. Confirm whether bed cloth is included and whether the rails are already covered. Then ask the installer to identify missing hardware and the maker or installer to approve replacements. Leave bolts with the pieces they came from. For a secondhand table, ask the installer whether the old cloth can go back on and whether fitting it is included in the quote.
1. Unpack and check the parts
- Compare every part and hardware bag with the exact parts diagram before fastening anything. Pause if a bag is missing or unidentified.
- Keep bolts and washers with the bags they came in and set finished pieces on padding.
- Identify the base or legs, cross supports, panels, covered or uncovered rails, pockets, cloth and any ball-return hardware.


Photograph damaged packaging and any cracked slate, loose backing or damaged attachment point. Save the packing information, take a close photo and a wider photo that locates the damage, and ask the seller or installer how to proceed before continuing. When the table is already disassembled, compare the pieces with the seller’s teardown photos and check the matching marks if it has them.
2. Build and level the base
Assemble the base and cross members in the model’s order, then position the frame and check for movement before putting any slate on it. The Copenhagen assembly drawings show separate legs and cross supports. For the Centennial, the pedestals start upright. Its manual allows frame assembly on the floor or on top of those pedestals if space is limited. Use the diagram for your table to decide how the cabinet is supported while you work.
Seat the fasteners in the places shown in the manual and use its tightening sequence. At the final position, check the frame lengthwise and across its width. Adjust the provided foot levelers or the supports permitted by the maker. A frame that rocks or has a loose cross member needs attention before anything is loaded on it. Check every foot or floor pad for firm contact. On a frame with cross members, check that they’re seated and fastened where the manual shows.


3. Place the slate on its supports
The installer sets each panel on the supports shown in the manual and aligns it with the others before final fastening. Identify the center and end pieces by the pocket cutouts and use the marks and mounting holes to match their positions. The Centennial manual places the center piece between two cross supports first. The installer levels the two end pieces before bringing the center flush with them. Use your own manual for placement, leveling and tightening.


Confirm the weight of each piece with the seller or installer, and confirm the route into the room with the crew. Playcraft’s Copenhagen manual calls for experienced assembly because the cabinet and slate are heavy. The crew and lifting equipment for your job depend on the bed, stairs and working space. If a panel is damaged, rocks on its supports or will not line up with the fasteners, have the installer identify why before it is tightened.
4. Level the slate and finish the joints
Ask the installer to show you two checks before covering the bed. Watch them put a precision level on each supported piece lengthwise and crosswise. Then have them lay a straightedge across each joint at several points along it. Even if both pieces are level, one face can still sit higher than the other.


Adjust at the locations allowed by the manual. Some tables use shims near their fasteners, built-in adjusters on the supports, or both. Recheck level and the joints after securing the panels. If one slate face still sits above the other, have the installer correct the support or alignment before filling the joint.
Once both faces sit flush along the joints, use the filler the maker specifies and leave the surface smooth before covering it. For example, the Centennial manual permits a suitable putty or wax. The filler smooths the joint after alignment. It cannot compensate for an unsupported panel or a step between the two faces.
5. Fit the cloth to the bed
Fit the cloth with its playing face up and secure it by the method specified for the bed and cloth. For Simonis cloth, the maker identifies the smoother face as the playing side and gives separate advice for glue-down jobs. On designs with wood backing intended for staples, the fasteners go into the backing. A bare slate edge requires the approved adhesive and method if the manufacturer specifies glue.

Clean the bed before laying the cloth. Follow the cloth maker’s tension and attachment order so the cloth lies smooth. Keep the material needed to wrap the pocket cutouts. Before the rails go on, check around the openings for ridges or loose folds.

Ask whether the rail cloth is already fitted. If the rails also need recovering, the rail cloth fastens differently from the bed cloth. In a rail built for a featherstrip, that narrow strip grips the cloth in its groove. The cloth wraps over the cushion and fastens underneath the rail.

6. Align the rails and check the pockets
Seat the rails and pockets in the model’s order, align them, and then tighten the correct hardware. On some tables the pockets join rails before the rail assembly is fitted to the slate. Sight along each long cushion across its side pocket. The Centennial manual shows the installer laying the rails and metal pocket fittings upside down on a padded surface. While the parts are upside down, the installer puts a straightedge across the side pocket to check that both rails line up. Follow the assembly order for your model. On the finished table, check that the cushion noses on either side of a middle pocket form one straight line.

Roll a ball gently into each pocket from more than one approach and check that it clears the liner. If there’s a ball return, roll one ball into each pocket in turn and make sure it reaches the return opening every time. Show the installer any pocket where a ball hangs up.

Follow the model instructions for optional panels, covers or lighting. If a component needs permanent electrical work, arrange that with a qualified electrician.
How do you check the finished installation?
Check the finished table with a clean ball after the rails are secured. Roll it slowly in both directions along several paths. Use the middle and one lane near each long cushion. Go back along the same lines from the other end. On a three-piece bed, those passes cross both joints. Repeat a suspicious path with a different ball and watch for drift toward the same physical side or a small hop in the same place.

If a ball drifts toward the same side each time, ask the installer to recheck that area with the level. If it hops in one place, roll across that spot again and have the installer look at both the joint and the cloth. A single curved roll could come from the stroke, spin, cloth or the ball. Show the installer the path that repeats and ask them to check it before you sign off. Pool Table Portfolio’s sign-off checks also call for clean balls and repeated rolls.
Try the same clean ball against each cushion from about the same distance and at a similar angle and pace. Watch for a cushion that rebounds noticeably less.

Tell the installer if a rail moves or you hear a rattle, and walk around the table with them to check the finish. Write down anything that needs work and who will come back to fix it.
What should stop the installation?
Check the frame before it takes the weight, the joints before they’re covered and the finished table before the installer leaves.
- Before adding slate to the base. Resolve a rocking frame, damaged attachment, missing hardware or unclear lifting plan. Confirm the final position while you can still change it.
- Before covering. Ask the installer to correct a loose shim, a gap at a support point or a slate edge that sits high. Then check both joints again after the fasteners are secure.
- Before accepting. Show the installer loose cloth, a ball that catches at a pocket, a jammed return or a roll that keeps drifting. Keep condition photos, the invoice and the installer’s return-visit terms.
How much does pool table installation cost?
Start with where the table is now. If the pieces are already in the game room, ask for setup alone. If they’re in the garage or on another floor, get a price that includes carrying them into the room. For a new table, check whether the order includes delivery and assembly. If the table is still together at another address, ask for a full pool table move with teardown, transport and setup.
| Provider | Price | Where and what the price covers |
|---|---|---|
| Manufacturer · Brunswick | $899 | Delivery, setup in your room and packaging cleanup for an eligible new table ordered directly. The location must be in the contiguous U.S. and within 50 miles of a participating authorized dealer. |
| Retailer · C&N Sales | $485 | Standard three-piece slate setup in southern Minnesota and northern Iowa. Mileage and certain features, such as a ball return, can add to the price. Antique tables are billed hourly. Check what the quote covers for carry-in, seams and cloth. |
| Independent technician · Seattle Pool Table Movers | $600 | Reassembly of an 8 ft three-piece table in the Seattle area with its parts already in the room. The installer levels the table and fits the cloth you supply. New cloth and stair carry can cost extra. |
Send the model, bed type, where the parts are now, the room and access photos, and what cloth you have. Ask for the price to leave a playable table, including frame assembly, slate leveling, joints, cloth and the final check. Identify missing hardware and ask who approves and supplies it. Ask separately about new cloth, repairs, extra trips, and the installer’s policy if a joint or level needs attention after the appointment.
For a table in your garage that needs to go down a turning stair, give each installer the same route measurements. Ask for one written total that covers the carry and all the setup work. Compare those totals once they include the same work.
| Item | What to confirm |
|---|---|
| Carry | Actual starting point, packed parts, stair turn, overhead gap and crew assessment. |
| Base and hardware | Who builds the base, who checks it before the slate goes on, and who supplies approved replacement parts. |
| Cloth | Whether the existing cloth is usable, bed and rail work, and the price if it needs replacing. |
| Finished job | Frame, slate, joints, rails, pockets, final checks, travel, extra trips and return terms. |
